23rd Regional Directorate of State Hydraulic Works (DSİ) - Kastamonu Flood Prevention – Rehabilitation in Yenice - Özal - Pirinçlik

Restoration of Araç Stream (Araç Çayı) passing through Yenice district which suffered damage in 1998 due to flood, by means of bored piles and concrete walls for the purpose of protection against flood in the center of the district.

Completed Projects | DSİ

3rd Regional Directorate of State Hydraulic Works (DSİ) - Eskisehir Construction of Günyurdu (Bakraş) Dam

Construction works of the dam which is 45 m in height, 320 m in crest length and have a volume of fill of 2,500,000 m3 and which will irrigate an area of 1250 hectares.

Completed Projects | DSİ

23rd Regional Directorate of State Hydraulic Works (DSİ) - Kastamonu Rehabilitation for Flood Prevention Facilities of Devrek 2-3

Restoration of Devrek Stream (Devrek Çayı) by means of bored piles and concrete walls in the center of Devrek which suffered damages to the flood in 1998.

Completed Projects | DSİ

23rd Regional Directorate of State Hydraulic Works (DSİ) - Kastamonu Rehabilitation for Flood Prevention Facilities of Devrek (Eğerci - Gökçebey)

Restoration of Devrek Stream (Devrek Çayı) by means of bored piles and concrete walls in the center of Devrek which suffered damages to the flood in 1998.

Completed Projects | DSİ

23rd Regional Directorate of State Hydraulic Works (DSİ) - Kastamonu Construction of Bartın Kozcağız-Hasankadı Road

Construction works of infrastructure and pavement for a part (29.4 km) of Kozcağız-Hasankadı road of Bartın province.

Completed Projects | DSİ

7th Regional Directorate of State Hydraulic Works (DSİ) - Samsun Construction of Sinop-Saraydüzü Dam

Construction of an irrigation dam, over Asarcık Stream (Asarcık Çayı), which is 290 m in crest length, 74 m in height above the foundation and which has an irrigation capacity for 4,200 hectares area and a derivation tunnel with a length of 470 m and a volume of fill of 3,000,000 m3. (This project was carried out as joint undertaking with SUTA İnşaat.)

Completed Projects | DSİ

9th Regional Directorate of State Hydraulic Works (DSİ) - Elazığ Boztepe (Recai Kutan) Dam - Malatya

Construction of an irrigation dam, over Kuruçay Stream (Kuruçay Deresi), which is 86 m in height and which has 2 crests in lengths of 852 and 340 m, an irrigation capacity for 20,000 hectares area and a water volume of 200,000,000 m3 and a volume of fill of 7,500,000 m3.

Completed Projects | DSİ

8th Regional Directorate of State Hydraulic Works (DSİ) - Elazığ Gökpınar Irrigation and Hacılar Hydroelectric Power Plant Construction

Construction of irrigation and HPP supply duct including main supply duct for the purpose of transferring 5 m3/s water from Gökpınar Lake to Hacılar HPP at 32nd km and therefore annual production of 15 MW energy, a main duct which is 100 km in length and regulator, 5 ea. tunnels, 5 ea. culverts, wall ducts and trapeze duct and regulator for the purpose of irrigating an area of 6061 hectares.

Ongoing Projects | DSİ

General Directorate of Turkish Hydraulic Works (DSİ) 10th Regional Directorate – Diyarbakır, Silvan Transmission Tunnel

21st century project which will transfer the water from Silvan dam to Silvan plain by means of two tunnels with a dimension of 7.80 m and length of 20,420 m (via tunnel boring machine (TBM)). (This project is carried out as joint undertaking with Yertaş İnşaat.)