General Directorate of State Airports Authority Construction of Gaziantep Airport

Construction works of complete runway in parallel to the existing runway of Gaziantep Airport; including concrete-covered infrastructure in a length of 3250 m and the electrical works.

Completed Projects | DHMİ

General Directorate of State Airports Authority Construction of Kars Airport

BHM (bituminous hot mixture) coating of the runway, apron and parking area of the airport with a length of 4250 m, installation of electrical and drainage system and construction of internal ring road.

Completed Projects | DHMİ

Construction of Anatolian Hotel Management and Tourism Vocational High School of Malatya Governorship

Construction works of applied education high school within the municipal boundaries of Malatya-Orduzu.

Completed Projects |

General Directorate of State Airports Authority Construction of Antalya Airport

Construction works of Antalya Airport; including customs areas, underground facilities tunnel and inner motorway.

Completed Projects | DHMİ

İstanbul Metropolitan Municipality Rehabilitation for Flood Prevention Facilities of Beşiktaş - Ortaköy

Restoration of drain, rain water and fresh water systems.

Completed Projects |

Construction of Yazıhan Multi Program High School of Malatya Governorship

Construction works of multi program high school within the boundaries of Malatya-Yazıhan.

Completed Projects |

Diyarbakır Metropolitan Municipality

Asphalt works of the main roads.

Completed Projects |

23rd Regional Directorate of State Hydraulic Works (DSİ) - Kastamonu Flood Prevention – Rehabilitation in Yenice - Özal - Pirinçlik

Restoration of Araç Stream (Araç Çayı) passing through Yenice district which suffered damage in 1998 due to flood, by means of bored piles and concrete walls for the purpose of protection against flood in the center of the district.

Completed Projects | DSİ

3rd Regional Directorate of State Hydraulic Works (DSİ) - Eskisehir Construction of Günyurdu (Bakraş) Dam

Construction works of the dam which is 45 m in height, 320 m in crest length and have a volume of fill of 2,500,000 m3 and which will irrigate an area of 1250 hectares.

Completed Projects | DSİ

5th Regional Directorate of Turkish State Highways (TCK) - Mersin Construction of Gaziantep-Kilis Road

Construction of 2x2 lane road providing a link between Gaziantep Airport and ring road; which is 17 km in length and coated with bituminous hot mixture.

Completed Projects | TCK

23rd Regional Directorate of State Hydraulic Works (DSİ) - Kastamonu Rehabilitation for Flood Prevention Facilities of Devrek 2-3

Restoration of Devrek Stream (Devrek Çayı) by means of bored piles and concrete walls in the center of Devrek which suffered damages to the flood in 1998.

Completed Projects | DSİ

23rd Regional Directorate of State Hydraulic Works (DSİ) - Kastamonu Rehabilitation for Flood Prevention Facilities of Devrek (Eğerci - Gökçebey)

Restoration of Devrek Stream (Devrek Çayı) by means of bored piles and concrete walls in the center of Devrek which suffered damages to the flood in 1998.

Completed Projects | DSİ

23rd Regional Directorate of State Hydraulic Works (DSİ) - Kastamonu Construction of Bartın Kozcağız-Hasankadı Road

Construction works of infrastructure and pavement for a part (29.4 km) of Kozcağız-Hasankadı road of Bartın province.

Completed Projects | DSİ

Restoration of Runway and Apron in NATO Military Airport - Diyarbakır

Improvement of runway in NATO Military Airport – Diyarbakır and construction of an apron of 120,000 m2.

Completed Projects |

Taraz-Talas-Suusamyr Highway Project (Phase-1) - Kyrgyzstan

Complete construction of Taraz-Talas highway which has a length of 53 km and funded by Islamic Development Bank; including concrete hot asphalt mixture. (This project was carried out as joint undertaking with Yertaş İnşaat.)

Completed Projects |

Taraz-Talas-Suusamyr Highway Project (Phase-2) - Kyrgyzstan

Complete construction of Taraz-Talas highway which has a length of 21 km and funded by Islamic Development Bank; including concrete hot asphalt mixture. (This project was carried out as joint undertaking with Yertaş İnşaat.)

Completed Projects |

Construction of Malatya Municipality Building

Construction of Municipal Building of 30,000 m2 in the city center of Malatya; of which project was elected by a contest.

Completed Projects |

9th Regional Directorate of Turkish State Highways (TCK) - Diyarbakır Construction of Bridge Crossing to Dicle University

Construction of bridge crossing at the intersection for university campus on the road from Diyarbakır to Silvan.

Completed Projects | TCK

7th Regional Directorate of State Hydraulic Works (DSİ) - Samsun Construction of Sinop-Saraydüzü Dam

Construction of an irrigation dam, over Asarcık Stream (Asarcık Çayı), which is 290 m in crest length, 74 m in height above the foundation and which has an irrigation capacity for 4,200 hectares area and a derivation tunnel with a length of 470 m and a volume of fill of 3,000,000 m3. (This project was carried out as joint undertaking with SUTA İnşaat.)

Completed Projects | DSİ

9th Regional Directorate of State Hydraulic Works (DSİ) - Elazığ Boztepe (Recai Kutan) Dam - Malatya

Construction of an irrigation dam, over Kuruçay Stream (Kuruçay Deresi), which is 86 m in height and which has 2 crests in lengths of 852 and 340 m, an irrigation capacity for 20,000 hectares area and a water volume of 200,000,000 m3 and a volume of fill of 7,500,000 m3.

Completed Projects | DSİ

15th Regional Directorate of Turkish State Highways (TCK) - Kastamonu Construction of II. Tube Tunnel – Dorukhan Tunnel Construction

Construction works including the improvement of the existing tunnel with a length of 903 m, located at 27th km of TEM Yeniçağa-Zonguldak road and construction of a new tunnel with a length of 1050 m and dimension of 12 m as the 2nd tube near the existing tunnel as well as the construction of entry-exit portals and roads.

Completed Projects | TCK

14th Regional Directorate of Turkish State Highways (TCK) - Bursa Construction of Balıkesir-Dursunbey Harmancık Road

Construction of Dursunbey-Harmancık (30 km) part (including Balat Bridge) of the road redesigned between Balıkesir-Kütahya.

Completed Projects | TCK

9th Regional Directorate of Turkish State Highways (TCK) - Diyarbakır Construction of Cizre-Silopi Road at Oyalı Intersection within Aşağı Tetek Project

Construction of the complete road of 77 km located within the boundaries of 9th Regional Directorate of Turkish State Highways; as coated with HBM (Hot Bituminous mixture) and having 2x2 lanes. (This project was carried out as joint undertaking with ACS İnşaat.)

Completed Projects | TCK

Turkish Electricity Generation and Transmission Corporation Construction of Ash Dam for Soma B Thermal Power Plant

Construction of the dam for the ash transfer system of the plant, transfer of the used water and ash to the catchment of the dam, use of water taken back from the catchment and for the storage of the ash. (This project was carried out as joint undertaking with Sistem İnşaat.)

Completed Projects |

General Directorate of State Airports Authority Construction of Apron and Taxiway in Diyarbakır Airport

Infrastructure construction works including apron, taxiway, underpass, electrical and mechanical works in Diyarbakır Airport transformed into an international airport.

Completed Projects | DHMİ

8th Regional Directorate of State Hydraulic Works (DSİ) - Elazığ Gökpınar Irrigation and Hacılar Hydroelectric Power Plant Construction

Construction of irrigation and HPP supply duct including main supply duct for the purpose of transferring 5 m3/s water from Gökpınar Lake to Hacılar HPP at 32nd km and therefore annual production of 15 MW energy, a main duct which is 100 km in length and regulator, 5 ea. tunnels, 5 ea. culverts, wall ducts and trapeze duct and regulator for the purpose of irrigating an area of 6061 hectares.

Ongoing Projects | DSİ

General Directorate of Turkish Hydraulic Works (DSİ) 10th Regional Directorate – Diyarbakır, Silvan İsale Tunnel

21st century project which will transfer the water from Silvan dam to Silvan plain by means of two tunnels with a dimension of 7.80 m and length of 20,420 m (via tunnel boring machine (TBM)). (This project is carried out as joint undertaking with Yertaş İnşaat.)

Ongoing Projects | DSİ

9th Regional Directorate of Turkish State Highways (TCK) - Diyarbakır Kocaköy – Genç Road at Diyarbakır – Silvan Intersection

Infrastructure and pavement works of a part (66 km) of Bingöl – Genç Road at the intersection for Diyarbakır – Silvan road which is within the boundaries of the 9th Regional Directorate of Turkish State Highways.

Ongoing Projects | TCK

Directorate General of Provincial Bank Construction of Sewage and Rainwater System in Muğla-Milas

Construction works including the construction of 204 km-sewage line and 55 km-rainwater line.

Ongoing Projects |