9th Regional Directorate of Turkish State Highways (TCK) - Diyarbakır Kocaköy – Genç Road at Diyarbakır – Silvan Intersection

Infrastructure and pavement works of a part (66 km) of Bingöl – Genç Road at the intersection for Diyarbakır – Silvan road which is within the boundaries of the 9th Regional Directorate of Turkish State Highways.

Ongoing Projects | TCK

15th Regional Directorate of Turkish State Highways (TCK) - Kastamonu Construction of II. Tube Tunnel – Dorukhan Tunnel Construction

Construction works including the improvement of the existing tunnel with a length of 903 m, located at 27th km of TEM Yeniçağa-Zonguldak road and construction of a new tunnel with a length of 1050 m and dimension of 12 m as the 2nd tube near the existing tunnel as well as the construction of entry-exit portals and roads.

Completed Projects | TCK

14th Regional Directorate of Turkish State Highways (TCK) - Bursa Construction of Balıkesir-Dursunbey Harmancık Road

Construction of Dursunbey-Harmancık (30 km) part (including Balat Bridge) of the road redesigned between Balıkesir-Kütahya.

Completed Projects | TCK

9th Regional Directorate of Turkish State Highways (TCK) - Diyarbakır Construction of Cizre-Silopi Road at Oyalı Intersection within Aşağı Tetek Project

Construction of the complete road of 77 km located within the boundaries of 9th Regional Directorate of Turkish State Highways; as coated with HBM (Hot Bituminous mixture) and having 2x2 lanes. (This project was carried out as joint undertaking with ACS İnşaat.)

Completed Projects | TCK

9th Regional Directorate of Turkish State Highways (TCK) - Diyarbakır Construction of Bridge Crossing to Dicle University

Construction of bridge crossing at the intersection for university campus on the road from Diyarbakır to Silvan.

Completed Projects | TCK

5th Regional Directorate of Turkish State Highways (TCK) - Mersin Construction of Gaziantep-Kilis Road

Construction of 2x2 lane road providing a link between Gaziantep Airport and ring road; which is 17 km in length and coated with bituminous hot mixture.

Completed Projects | TCK